Plumbing, Process Piping Refrigeration Piping & Hydronics

 

We offer our clients a complete engineering and construction services that compliments the rest of the divisions. The plumbing department specializes in all aspects of sanitary systems, water supplies and natural gas services.

The Refrigeration piping department can design and install the vast majority of comfort cooling systems. We are environmentally conscious company and will reclaim all refrigerants as required by law.

The Hydronics department is an integral part of our organization and will perform all of the required chilled hot and steam water systems as required.

Our process-piping department is an entity by itself and we offer design and installation of various piping facilities for a multitude of end users. From microelectronics to medical facilities and biotech labs, SVM mechanics will install to the latest methods of technology your facilities requirement using your specific needs of the various materials. Our experience includes Copper, PVC, Stainless, Poly-Pro, Stainless Steel and a multitude of specialty materials that are available to the industry needs. We have performed installations in live Clean rooms and completed construction for new FABS and LABS

Key Benefits

  • SVM Engineers design all of these services
  • Department managers are in complete control of all aspects of the construction phases
  • We utilize the latest methods of construction and adapt ourselves to the ever-changing technology

Reference Accounts

We have just completed or in the process of completing the installation on the following projects

Cybeq Nano System: This includes all new DI water plant, CDA, Vacuum, Slurry distribution and drainage and monitoring systems. We also designed and built an extensive refrigeration plant for the HVAC system.

Sun Microsystems Sunnyvale: This includes a new chilled water system for after hours and supplemental cooling in a three-story office building

Finisar Clean Rooms : We designed and built an extensive refrigeration plant for the HVAC system. This is part of the temperature control system that was required due to the large quantity of the exhaust air 

Seagate Technologies: This includes the upgrade and replacement of three air cooled chiller plants at a total of 1500 Tons.

LSI Logic: This includes process piping and chilled water piping to the new class 10- 8" wafer FAB. This project also includes replacement of two 759-Ton centrifugal chillers.

Zepton Networks: This includes a new chilled water and process cooling piping plant to the new clean facilities. This project is vital to insure the proper water system required for the manufacturing process.