| AND-PAK | This project includes an office building and 70,000 square feet of open manufacturing and H-7 area. The project includes general ventilation and emergency ventilation system that are designed to provide a safe haven for the operators in case of a catastrophic discharge. |
| Axon Photonics | A complete renovation of 63K sqft building that includes a VAV hot water rehaeat system and Trane Summit DDC controls. |
| ChipPAC | This 63,000 square feet facilities is a state of the art computer controlled office building with some computer server labs. |
| Condor Systems | This is a two building facility (175,000 SQ. Ft. complex) that houses light manufacturing, computer and server labs, full service cafeteria and a corporate headquarters offices. This facility is controlled by a DDC controls system. |
| CYBEC- Class 10 Clean rooms | This project includes the construction of multiple clean rooms that include an elaborate ACID and Solvent exhaust systems. All of the clean rooms operate under a very tight temperature and humidity control criteria. |
| Cybeq Nano System | This includes all new DI water plant, CDA, Vacuum, Slurry distribution and drainage and monitoring systems. We also designed and built an extensive refrigeration plant for the HVAC system. |
| D&H Manufacturing | This multi-building complex is a state of the art computer controlled heavy manufacturing facilities. Our challenge was to provide a conditioned high bay manufacturing buildings and allow for the installation of an overhead crane. |
| Finisar Clean Rooms | We designed and built an extensive refrigeration plant for the HVAC system. This is part of the temperature control system that was required due to the large quantity of the exhaust air |
| Gray, Cary Ware | A complete renovation of 63K sqft building that includes a VAV hot water rehaeat system and Trane Summit DDC controls. |
| Hillview Business Park | Tennant Improvment of a four building Campus. These buildings were served by a VAV system with hot water reheat. The campus size was 205K sqft. |
| Hillview Office Complex | This project includes the construction of several multi story buildings that are used for multiple tenants. The system includes individual roof top packaged VAV units and hot water reheat systems for zone controls. These buildings are the home of a multitude of different companies. |
| Kestrel Solutions | This project includes a multiple building campus that houses manufacturing facilities for a state of the art 10 Gigabits per second (Gbps) optical multiplexer systems and a corporate headquarters environment. We have been involved in the new construction, remodels and ongoing service and maintenance for the entire facilities. We are pleased to be part of their continued growth. |
| LSI Logic | This includes process piping and chilled water piping to the new class 10- 8" wafer FAB. This project also includes replacement of two 759-Ton centrifugal chillers. |
| Paramit corporation | This (165,000 SQ. Ft. complex) is built for a manufacturing and corporate head quarters facilities. This facilities is controlled by a DDC controls system. |
| Rohm | This project is one of our in-house ongoing services, which includes several process equipment relocation and hookup. This four building manufacturing facility is always remodeling and expanding their clean rooms and manufacturing area. We are pleased to be part of their growth. |
| Ryan Ranch Office Complex - Monterey | This multi-building complex that we have been involved in many remodels and new construction off several multi-tenant office buildings. |
| Seagate Technologies | This includes the upgrade and replacement of three air cooled chiller plants at a total of 1500 Tons. |
| Sun Microsystems Sunnyvale | This includes a new chilled water system for after hours and supplemental cooling in a three-story office building |
| Thomas Road R&D | Two Spec buildings 70K sqft that includes a VAV system with hot water reheat. The rooft top units were controlled by a Summit DDC controls system. |
| TIVO | This project includes the construction of 150,000 square feet of office and servers lab. This will serve as the new home for TIVO |
| Tivo Buildings E&D | A complete T.I. of two 70K sqft buildings that includes a dual duct VAV system with packaged constant volje units for the 24/7area. The controls were mixed pneumatics and a Tracker system. |
| VA Linux | This multi-building complex is a state of the art computer controlled office building with several computer server labs. The challenge was to provide multiple source of cooling to the server labs and provide back-up to ensure reliability and un-interrupted operation. |
| Zepton | This project includes the construction of multiple H-6 & H-7 clean rooms that include an elaborate single pass conditioned air systems. Some of the clean rooms operate under a very tight temperature and humidity control criteria. This facilities is served by a multiple exhaust systems that include scrubbed, heat and solvent exhaust systems. |
| Zepton Networks | This includes a new chilled water and process cooling piping plant to the new clean facilities. This project is vital to insure the proper water system required for the manufacturing process. |